The AIS Blog
Practical guidance on industrial coatings, pallet racking, painting, and energy efficiency — from the floor up.
48-Hour Epoxy Installation at Magna: How We Coated 14,000 Square Feet in Four Consecutive Weekends
A tier-1 automotive supplier needed 14,000 sqft of white epoxy and 4,000 sqft of stained polished concrete installed without disrupting production. Here's how we delivered on a 48-hour weekend-only schedule.
Read post →Fixing a Failed Basement Epoxy Floor: Moisture Mitigation for an Art Gallery Print Room
How we solved chronic moisture problems in a 2,600 sqft basement print room using MVB primer, complete chip broadcast, and a chemical-resistant siloxane topcoat.
Read post →225,000 Square Feet of Polished Concrete: Building the Warehouse of the Future in Tennessee
How a 3000-grit polished concrete floor delivered 75% light reflectivity, cut energy costs by half, and survived six months of heavy construction in a Tennessee facility.
Read post →Selecting the Right Industrial Floor Coating: Four Questions Every Facility Manager Should Ask
Not every epoxy system fits every floor. Here's the four-question framework Michigan contractors use to match the right industrial coating to your facility.
Read post →Polyaspartic vs Epoxy Floor Coating — Which One Belongs in Your Facility?
Both polyaspartic and epoxy can give a warehouse or shop a tough, professional-looking floor. But cure time, downtime, and chemical exposure make the right choice obvious once you know what to look for.
Read post →Minimizing Downtime: A 3.5-Day Warehouse Floor Transformation in Wixom
Learn how we resurfaced a 12,000 sq ft automotive warehouse in Wixom using polyaspartic coatings to ensure rapid return to service.
Read post →