Minimizing Downtime: A 3.5-Day Warehouse Floor Transformation in Wixom
Learn how we resurfaced a 12,000 sq ft automotive warehouse in Wixom using polyaspartic coatings to ensure rapid return to service.
For automotive parts suppliers and large-scale distributors, every hour a warehouse floor is out of commission represents lost productivity and disrupted supply chains. When a facility manager sees delaminating epoxy near dock doors, the dilemma is often between a long-term fix and the immediate need to keep forklifts moving.
Last week, Ace Industrial Solutions tackled exactly this challenge for a client in Wixom, Michigan. The project involved a 12,000 sq ft warehouse floor where the existing eight-year-old epoxy coating was beginning to fail, particularly in high-traffic areas near the loading docks.
The Challenge: Managing Delamination and Moisture
The first step in any professional industrial coating project is assessing the substrate. We found that the existing coating was starting to delaminate, likely due to the heavy mechanical wear of forklift traffic and the environmental stresses common in automotive logistics.
Before applying any new material, we performed rigorous concrete moisture testing. Our results showed a reading of 3.2 lbs CaCl. This step is critical; ignoring moisture levels is the most common reason for premature coating failure. Because we identified the moisture profile upfront, we could select the appropriate primer and topcoat system to ensure long-term adhesion.
The Solution: The Power of Polyaspartic Coatings
While many facilities rely on traditional epoxy, this project utilized a high-performance polyaspartic topcoat over an MVB primer.
When comparing polyaspartic vs epoxy floor coating, the most significant advantage for a working warehouse is the cure time. Unlike traditional multi-day epoxy applications that require extended downtime, our polyaspartic system allowed us to move quickly without sacrificing durability.
Our process included:
- Surface Preparation: We ground the old, failing coating off the concrete to reveal a clean, profiled surface.
- Moisture Mitigation: Using the MVB primer to bridge the gap between the moisture-tested substrate and the new coating.
- Application: Applying the polyaspartic topcoat for maximum abrasion resistance.
Rapid Return to Service
The most important metric for this Wixom facility was the timeline. We completed the entire transformation in just 3.5 days.
The transition was seamless. By the time Monday morning arrived, the warehouse was fully operational, with forklift traffic resuming exactly as scheduled. This rapid turnaround is a hallmark of our approach to industrial coatings: providing a permanent, high-performance solution that respects your operational requirements.
If you are searching for a warehouse floor coating contractor near me in Southeast Michigan, or if you are currently evaluating whether to repair or replace a damaged warehouse floor, Ace Industrial Solutions is ready to help. We specialize in minimizing downtime during epoxy floor installs while delivering the durability your facility demands.
For more information on our industrial coating services, contact us at sales@aceindustrialsolutions.net.